← AVIATION GLOSSARY
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Aviation glossary

What is a geodetic survey?

Surveying · Geodesy 8 languages
Definition
A geodetic survey is a survey that refers all positions to a geodetic datum. Heights refer to a reference ellipsoid or to the geoid.

A geodetic survey is a survey that refers all positions to a geodetic datum. The coordinates from different surveys then share one reference system.

Geodesy is the science of accurately measuring the shape of the Earth. Geodetic surveying is the branch of surveying in which you must take the curvature of the Earth into account when you determine directions and distances. This page explains how a geodetic survey works and how it reaches aerodromes. The page on the geodetic datum explains the datum itself.

Geodetic and plane surveying

A plane survey covers a small area. It takes no account of the curvature of the Earth. The surveyor can treat a city as a flat surface, and positions in it are exact relative to each other.

The Defense Mapping Agency text calls triangulation the most common type of geodetic survey. It lists four differences from a plane survey:

  • It uses more accurate instruments.
  • It removes instrument errors, or determines them first so that the computation can correct for them.
  • It uses more rigorous procedures to reduce observation errors.
  • All the positions that it establishes are mathematically related to each other.

Control points and networks

A control point is a point with assigned coordinates. Later surveys use these coordinates. A control network is the geodetic control together with the measured or adjusted distances, angles, directions or heights that gave its coordinates.

A bench mark is a lasting object with a marked point. The elevation of the point above or below an adopted datum is known. NOAA describes reference points as physical markers in the ground. It says that a set of accurately measured points is the basis for the US National Spatial Reference System (NSRS).

How the datum, the survey and a project fit together

The three parts have different jobs:

  • The datum is the set of chosen conventions. Ordnance Survey says that it is not any control network that is based on it.
  • The geodetic survey puts points on the ground into the datum. Ordnance Survey calls the adding of local points to a reference frame a control survey. The known points are the datum realisation.
  • A project uses those points. FAA AC 150/5300-16B says that the marks assure accurate relativity between surveyed points on an airport. They also assure it between these points and other surveyed points in the National Airspace System.

Methods

Geodetic surveys use these methods:

  • Satellite positioning. Geodesists now use space-based tools such as the Global Positioning System (GPS) to measure points on the surface. A satellite receiver computes its position in WGS 84.
  • Astronomic positioning. The surveyor observes the stars. A single astronomic position cannot be related to another with enough accuracy, unless other geodetic surveys connect them.
  • Triangulation. The surveyor measures the angles of a series of triangles. One measured side and its two end angles give the other two sides.
  • Trilateration. The surveyor measures only distances. The angles are then computed.
  • Traverse. The surveyor starts at a known position and measures angles and distances between a series of survey points.
  • Leveling. Differential leveling is the most accurate of three techniques. Trigonometric leveling is less accurate, and barometric leveling is less accurate still.
  • Gravity measurements. Geodesists measure small differences in gravity to understand the shape of the Earth.

Triangulation, trilateration and traverse are classical methods. The Defense Mapping Agency text that describes them dates from 1984. FAA AC 150/5300-16B requires GPS ground surveying methods for airport geodetic control.

Datum, ellipsoid and geoid

Every geodetic survey names its geodetic datum. A datum uses a reference ellipsoid. This is a smooth mathematical surface that approximates the figure of the Earth. A change of datum changes the coordinates of a point.

The geoid is the equipotential surface in the Earth’s gravity field that coincides with undisturbed mean sea level (MSL). The geoid undulation is the distance of the geoid above or below the ellipsoid.

A satellite receiver gives an ellipsoidal height. An orthometric height is a gravity-related height above the geoid, and it is generally shown as an MSL elevation. The difference between the two is the geoid undulation. Leveling gives heights above a vertical datum. GPS gives heights above the ellipsoid. A survey report must state which height type it gives.

Datums at an aerodrome

ICAO Annex 14 requires WGS-84 as the horizontal reference system. It requires the MSL datum, which relates to the geoid, as the vertical reference system. The EU rule for aerodrome operators says the same (ADR.OPS.A.020). EASA also advises EGM-96 as the global gravity model.

Annex 14 requires the aerodrome elevation and the geoid undulation at that position to be measured to half a metre or foot. At an aerodrome with non-precision approaches, the same applies to each threshold. On a precision approach runway, the threshold needs one-quarter metre or foot.

Survey rules for EU aerodromes

EU rules treat surveying as part of aeronautical data. The aerodrome operator must make sure that the accuracy of the data is as the aeronautical data catalogue specifies. The operator must also keep the data traceable (ADR.OPS.A.010).

EASA lists which points a surveyor takes:

  • A runway threshold is at the geometric centre of the runway, at the beginning of the paved surface. Where threshold lighting is surveyed, the report describes its locations on a diagram.
  • For a taxiway, an apron taxilane or an aircraft stand, the reference is the mid-width of the centre line marking. The surveyor takes the start and end of each straight section and enough extra points to keep the required accuracy.

The aerodrome manual describes the procedures and frequencies for aeronautical data surveying, including the areas to survey (AMC3 ADR.OR.E.005). An operator may contract surveying out to an outside organisation (GM1 ADR.OR.D.010).

Airport geodetic control in the United States

FAA AC 150/5300-16B explains how to establish geodetic control on or near an airport and how to submit it to the National Geodetic Survey. The AC is not a regulation. It is mandatory for projects that Federal grant programs such as the Airport Improvement Program fund.

The AC asks for three permanent survey marks on, or within one kilometre of, the airport:

  • One Primary Airport Control Station (PACS). It has a direct horizontal and vertical tie to the NSRS.
  • Two Secondary Airport Control Stations (SACS). Each has a direct tie to the PACS.

These marks serve later work on the airport, such as runway and taxiway construction, navigational aid siting and obstruction clearing. The AC uses NAD 83 as the horizontal datum and NAVD 88 as the vertical reference where it is defined. Each mark has accuracy standards at the 95 percent confidence level:

StationHorizontalOrthometric heightEllipsoid height
PACS3 cm5 cm5 cm
SACS2 cm5 cm4 cm

The PACS values are network accuracies, relative to the NSRS stations that serve as constraints. The SACS values are local accuracies, relative to the PACS and the other SACS at the airport.

The FAA also uses aeronautical survey data to design and review instrument flight procedures. AC 150/5300-13B says to perform geospatial surveys in accordance with AC 150/5300-16, AC 150/5300-17 and AC 150/5300-18. AC 150/5300-17 is titled Standards for Using Remote Sensing Technologies in Airport Surveys.

Changing the datum

A change from one datum to another is a coordinate transformation. Its parameters come from measurement, so they carry errors. A conversion inside one datum, such as a map projection, does not.

Frequently Asked Questions

What is a geodetic survey?
A geodetic survey is a survey that refers all positions to a geodetic datum, so that the coordinates from different surveys share one reference system. It is the branch of surveying in which you must take the curvature of the Earth into account.
What is the difference between geodetic surveying and plane surveying?
A plane survey covers a small area and does not take the curvature of the Earth into account. Triangulation, the most common type of geodetic survey, uses more accurate instruments and more rigorous procedures. All the positions that it establishes are mathematically related to each other.
What is geodetic control?
Geodetic control is a set of control stations that a geodetic survey establishes. A control point is a point with assigned coordinates, and later surveys use those coordinates. A control network is the control together with the measurements that gave its coordinates.
What methods does geodetic surveying use?
Modern geodetic surveys use satellite positioning, such as GPS, and leveling for heights. Classical methods are astronomic positioning, triangulation, trilateration and traverse. Geodesists also measure small differences in gravity.
What is geodetic surveying used for?
Geodetic surveying gives all points in a region one consistent reference, so that maps and surveys agree. NOAA says that organizations use geodesy to map the shoreline, determine land boundaries and improve transportation and navigation safety. At an airport, the control marks serve later survey, engineering and mapping work.
What is the difference between ellipsoidal height and orthometric height?
Ellipsoidal height is the distance above the reference ellipsoid. Orthometric height is the gravity-related height above the geoid, which is generally given as a mean sea level elevation. The difference between the two is the geoid undulation.
What is airport geodetic control in the United States?
It is a set of permanent survey marks on or near the airport that tie the airport to the National Spatial Reference System. FAA AC 150/5300-16B asks for a Primary Airport Control Station (PACS) and two Secondary Airport Control Stations (SACS).

This is a reference entry. TarmacView provides drone inspection services and doesn't sell the equipment or materials described in this glossary.

Get Started Need your airfield lighting verified? TarmacView inspects approach, runway and taxiway lights and the runway surface by drone, during full airport operation. The lighting protocol comes the same day.
Keep reading

Learn more

04 PAGES

Related terms

03 TERMS
Surveying
glossary

Surveying

Surveying is the measurement of the position of objects and physical features on, above or below the Earth's surface. Branches, types, instruments, GNSS, and how an aerodrome surveys runways and obstacles.

Reference Datum
glossary

Reference Datum

A reference datum is a model of the Earth, and its relation to the real Earth, that gives coordinates one clear meaning. Horizontal, vertical and tidal datums, types of coordinates, a vertical datum change, the datum origin, and the datums that aerodromes use.

Control Network
glossary

Control Network

A control network is a set of marked ground points with known coordinates that later surveys use as a reference. Horizontal and vertical control, airport PACS and SACS, and ground control for drone surveys.

Further reading

01 ARTICLES