What is Baseline Data?

Aviation · Data 8 languages
Definition
Baseline data is the first set of measurements of a system that later measurements are compared with to show change.

Baseline Data

Baseline data is the first set of measurements of a system that later measurements are compared with to show change.

The US Centers for Disease Control and Prevention (CDC) defines a baseline as the initial measurement of information. Staff collect it before the intervention of a program begins. The word “intervention” can mean a training course, a new rule, a repair or a new tool. The baseline is the “before” half of every before-and-after comparison.

How baseline data works

A single measurement tells you where you are. It does not tell you whether you moved. CDC evaluation staff say that a baseline serves as a point of reference. Without one, it is difficult to estimate any change or to show progress.

Four steps make a baseline usable.

  1. State the question first. Decide what you want to show. Without a main question, you do not know what to collect.
  2. Choose indicators. An indicator is a measure that tracks the thing you care about, such as a failure rate or a score.
  3. Collect before the change. The data must come from the period before the intervention begins.
  4. Repeat the method later. The CDC advises you to collect the information the same way in the future. A change in method looks like a change in the result.

Where baseline data comes from

The CDC names three kinds of source.

  • Current data you can access. You already hold it and can run reports from it.
  • Existing data you cannot access. Another organisation holds it. You need an agreement, and this often takes longer than planned.
  • Primary data collection. The data does not exist, so you build a new way to gather it. It takes time and costs money.

The CDC advises a scan for an existing source before you commit to primary collection. Check the gaps and the scope of each source. A data set that covers a whole state may not fit a program in one county.

A worked example

A clinic wants to know whether a training course improves blood pressure control.

  • Baseline, before the course: a mean systolic pressure of 150 millimetres of mercury (mmHg).
  • Follow-up, six months after the course: a mean of 138 mmHg.
  • Change: 138 − 150 = −12 mmHg.
  • Percent change: −12 ÷ 150 × 100 = −8.0 percent.

The numbers are invented to show the arithmetic. The method is general. Change is the follow-up value minus the baseline value. Percent change is that difference divided by the baseline value.

What to do when no baseline exists

The CDC gives three ways to estimate one.

  • Past performance. Use records from an earlier period.
  • A timeframe. Pick a period just before the program began. If funding began in July, May may be the best month to begin the baseline.
  • A proxy. Use a related measure when the exact one is not available. The CDC example uses medication cost claims as a proxy for hypertension control.

The CDC says that an estimated baseline is better than none. State how you built it, so the reader can judge the comparison.

  • Baseline versus benchmark. A baseline is your own initial value. A benchmark is an outside reference to compare against. See the benchmark page.
  • Baseline versus baseline assessment. A baseline assessment is the work of describing the current state. The baseline data is the result. See baseline assessment .
  • Baseline in systems engineering. The National Aeronautics and Space Administration (NASA) handbook defines a baseline as an agreed-to set of requirements, designs or documents. Changes to it go through a formal approval process. Here the baseline is a controlled description, not a set of measurements.

Common mistakes

  • Collecting the baseline after the change begins. It then shows part of the effect, not the initial state.
  • Changing the method between rounds. A new instrument or a new definition breaks the comparison.
  • Using one reading. One reading hides normal variation. Repeat the measurement where you can.
  • Comparing with a benchmark and calling it a baseline. The two answer different questions.
  • Not writing down how the baseline was made. An estimated baseline needs its method recorded.

Baseline data at an aerodrome

The aerodrome sources use the same idea under other names. None of them defines “baseline data” as a document type.

  • Safety management. European Union Aviation Safety Agency (EASA) guidance for aerodrome operators says that the system description is a preliminary activity in planning the safety management system. It is used to determine a baseline hazard analysis. The operator reviews it periodically.
  • Certification. The International Civil Aviation Organization (ICAO) Annex 14 says that the certification process also establishes the baseline for continued monitoring of compliance with the specifications.
  • Pavement. A pavement management program is a set of defined procedures for collecting, analyzing, maintaining and reporting pavement data. It evaluates the present condition of a pavement and predicts the future condition by projecting the rate of deterioration. The US Federal Aviation Administration (FAA) sets a detailed inspection at least once a year. With pavement condition index (PCI) surveys, the interval may be three years.

The same logic applies to any inspection you repeat. The first record under one method is the reference. Later records use the same method, so a difference shows a change in the airfield and not in the method.

Frequently Asked Questions

What is baseline data?
Baseline data is the initial measurement of information, collected before an intervention or change begins. Later measurements are compared with it. Without it, you have one point in time and cannot show whether anything improved.
What does baseline data refer to?
It refers to data that describe performance before an intervention. It does not mean information collected after the intervention begins. The CDC calls the baseline the initial measurement collected before the program begins.
Why is baseline data important?
It is the point of reference. CDC evaluation staff say that without baseline data it is difficult to estimate any change or to show progress. The baseline lets you compare what happens before and after a program.
What is meant by a system's baseline data?
In systems engineering, a baseline is an agreed set of requirements, designs or documents. Changes to it go through a formal approval process. The baseline records the agreed state at one point in time, and later changes are measured against it.
How is baseline data different from benchmark data?
A baseline is your own initial measurement. A benchmark is a value from outside, such as a standard or another organisation, that you compare against. The two answer different questions, so do not mix them in one table.
What if no baseline data exists?
Estimate one. The CDC suggests three ways. Look at past performance, choose a timeframe before the program began, or use a proxy measure. An estimated baseline is better than none, and you should say how you made it.
Does ICAO or EASA require baseline data?
No source that was checked requires a document with this name. EASA guidance asks the aerodrome operator to make a baseline hazard analysis and to review it periodically. ICAO Annex 14 says that certification establishes the baseline for continued monitoring of compliance.
How often must an airport inspect its pavement to compare it with earlier results?
In the United States, a federally obligated airport must make a detailed pavement inspection at least once a year for its pavement management program. If it uses pavement condition index (PCI) surveys under ASTM D5340, it may extend the interval to three years.

References

icao-annex-14-vol-i
Annex 14 to the Convention on International Civil Aviation, Aerodromes, Volume I, Aerodrome Design and Operations, Ninth Edition, July 2022 ICAO
cdc-baseline-coffee-break
Coffee Break: Establishing a Baseline for Your Evaluation (transcript) CDC, Division for Heart Disease and Stroke Prevention, Evaluation Team

This is a reference entry. TarmacView provides drone inspection services and doesn't sell the equipment or materials described in this glossary.

Get Started Need your airfield lighting verified? TarmacView inspects approach, runway and taxiway lights and the runway surface by drone, during full airport operation. The lighting protocol comes the same day.
Keep reading

Learn more

03 PAGES
Baseline Assessment
glossary

Baseline Assessment

A Baseline Assessment in aviation quality assurance is a systematic evaluation of the current state of a system, process, or operation prior to changes. It establishes a documented reference point for future comparisons, supporting safety, compliance, and performance improvement.

Baseline (Surveying)
glossary

Baseline (Surveying)

A baseline in surveying is the fundamental reference line from which all measurements, mapping, and construction layouts are coordinated. It underpins property boundaries, construction accuracy, and geodetic networks.

Data Point
glossary

Data Point

A data point is one value or observation in a data set. It differs from a datum. See types, a worked mean and median, and outliers.