
Runway Centreline Lights Inspection by Drone
Drone inspection of runway centreline lights. Every inset unit counted, its colour coding checked and its output set against its neighbours, scored to…
The touchdown zone lights are the inset white barrettes either side of the centre line where a crew in low visibility expects the wheels to meet the runway. Every landing puts rubber on them. We fly the touchdown zone and record every unit: lit or dark, its colour, its output against its neighbours and its surveyed position, then score the system against its own limit.
Every picture below comes from an inspection we flew: drone frames, field photos and app screens. The brackets mark what the analysis reads.
4K frame from a PAPI flight on 9 Sep 2026, downscaled to 2880 px.
4K frame from the 18 Sep 2026 session, every bracket on a detected light.
This service is bought by the person who signs the touchdown zone row of the visual aids protocol and knows that the lights under the landing gear lose output before they go dark. It fits the electrical manager at an aerodrome with CAT II or III operations, the operator planning a rubber removal or a cleaning round who wants to send the crew to the right units, and the aerodrome that has resurfaced the first part of a runway and needs to show that every unit is back.
Three outcomes are what the service is judged on, and each has a state you can check on delivery rather than a promise you have to trust.
Each unit in the touchdown zone comes back lit or dark, with its colour, its output against its neighbours and its surveyed position.
The touchdown zone lights are counted as one system and set against the serviceability objective for the operating category you name, with any adjacent unserviceable units named with their positions, so you can judge them against the rule on adjacent outages. The centre line beside them gets its own count.
Units are ordered by how far they sit below their neighbours, so the lenses to clean and the fittings to open are listed in the order the work should be done.
The touchdown zone is flown with the centre line, so every unit is seen from the same height and angle as the ones before and after it.

The drone tracks the centre line from the threshold over the length of the touchdown zone, generated from the surveyed unit positions, so each unit passes through the frame at the same distance as its neighbours. That is what makes one unit's output comparable with the next, and with the unit across the centre line. A leg that fits between movements covers the touchdown zone and the centre line together, and is reflown whole if a movement interrupts it.

Every unit is tracked through the footage and scored on its own: lit or dark, its colour against the white it should show, and its output against the units beside it. Each unit is also found at its surveyed position, so a dark or missing unit is located by position and not only as a lower count. Adjacent unserviceable units are named with their positions.
The touchdown zone row of the visual aids protocol, each item with the figure it is judged against.
Every unit in the layout is present at its surveyed position, either side of the centre line, from the threshold over the length the layout gives.
Each unit shows white, on every unit in the touchdown zone.
A unit whose main beam average intensity has fallen below half the specified value, or whose filter is missing, damaged or the wrong colour, is counted as unserviceable even if it is lit.
Share of touchdown zone units serviceable during CAT II or III operations.
Share of touchdown zone units serviceable during CAT I operations, where the runway has them.
Units that are unserviceable and next to each other are named with their positions, so they can be judged against the rule.
Every unit changes intensity together and by the commanded step.
Each unit sits at its surveyed position, and a dark or missing unit is reported against the light it belongs to.
You name the runway ends with touchdown zone lights, whether the centre line is in scope on the same fly-over, the operating category the system must meet and whether a surveyed layout exists. We agree the intensity steps to be checked and the protocol template your authority wants. Output is a scope note. If the layout does not exist, the first visit produces it.
The fly-over is generated from the unit positions, the length of the touchdown zone and the camera optics, split into legs that fit between movements. Output is a validated mission and a capture window request to your tower, plus a request to your lighting control room for the steps to be commanded.
Flown between aircraft movements, usually in the same leg as the centre line and the same sortie as the edge rows and the bars at each end. Each leg is flown at every intensity step in scope, and an interrupted leg is reflown unchanged.
Each unit is tracked through the footage and its state, colour, output and position are extracted, then set against the units beside it and against the surveyed layout. Frames the tracker is not confident about are held for review rather than dropped.
The touchdown zone row of the visual aids protocol is filled in your authority's wording, with a verdict per unit, the positions of dark or missing units, the adjacent unserviceable units, a count and a percentage for the system and a ranked list of the units to attend to. Delivered the same day, with the flight record and the source frames attached.
We walk your electrical manager through the units that failed and any unserviceable units that sit next to each other. Anything disputed is re-examined against the retained footage rather than re-flown.

Example of the per-unit output from a fly-over, shown here for runway edge lights
The touchdown zone is where a landing aircraft is meant to put its wheels down, and the touchdown zone lights mark it for a crew that cannot see the markings. They are in-pavement lights laid out as pairs of barrettes either side of the centre line, and every landing runs over them, so rubber builds on their lenses with every movement. A unit under that film can be lit, pass a night walk and still be unserviceable, because under ADR.OPS.C.015 a light has failed once the average intensity of its main beam falls below half the specified value.
The inspection measures every unit from the same height and angle on one fly-over, so each unit can be set against the units beside it and against the units across the centre line. A lens under rubber stands out from the clean ones around it, and the protocol names it with its light intensity relative to its neighbours and its position from RTK positioning . That is the list a rubber removal or a cleaning round should start from. Its colour is read from the same footage, so a unit whose chromaticity has drifted from white is reported with what was seen.
Adjacent outages are the second thing a count misses. A crew reads the touchdown zone as pairs of bars. Under ADR.OPS.C.015 the lights allowed to be unserviceable must not alter the pattern of the system, and the rule on adjacent outages has a specific allowance for a barrette. The protocol does not give a verdict on the pattern. It names the unserviceable units that sit next to each other, with their positions, so the operator can judge them against the rule. The count and percentage for the system come on top of that.
The system is then judged as the rules judge it. ADR.OPS.C.015 sets 90 percent serviceability for the touchdown zone lights in CAT II and III operations, a different figure from the centre line beside them. The protocol gives the count, the percentage and the position of every unserviceable unit, so whether the runway keeps its category is a decision the operator makes from figures rather than from an impression. The runway light serviceability limits guide sets out every system’s figure and what happens below it.
There is no published rate for this service, because one runway end with touchdown zone lights and both ends of two runways are different days of work off the same method. The quote gives your figure, and the pricing page describes the combined visit.
Three things can stop or degrade an inspection, and each has an owner.
Fog, precipitation and wind above the drone's limit stop the capture, and standing water over inset units changes the way they read from above. The mission is flown when the window opens rather than measured through the weather. This is the most common reason a date moves.
A fly-over along the runway axis needs tower coordination and runway time between movements, at most aerodromes an escort, and a control room that can command the intensity steps. All of it sits with the aerodrome operator and is worth confirming before travel is booked.
Each unit is scored against its surveyed position and the system against the limit for the category you name. If units were moved or replaced during resurfacing since the layout was made, the scoring is against the wrong layout. Both are agreed at scoping.

Drone inspection of runway centreline lights. Every inset unit counted, its colour coding checked and its output set against its neighbours, scored to…

Drone inspection of taxiway lights. Every edge and centreline unit counted, stop bars and guard lights checked, each unit placed on the layout, from a…

Drone inspection of runway threshold and end lights. Every unit in each bar counted, its colour checked and each bar scored against its serviceability…
Send the aerodrome, the runways with touchdown zone lights and whether the lighting has a surveyed layout. That is enough to scope. You get a written scope note and a price back within two working days, and the scope note is not binding until you accept it.
Cookie Consent
We use cookies to enhance your browsing experience and analyze our traffic. See our privacy policy.