What is decommissioning?
Decommissioning is the process that takes a facility or system permanently out of service. The word is general. It is used for nuclear plants, offshore platforms, IT hardware and buildings, and no single standard defines it for all of them.
What decommissioning means
The US Nuclear Regulatory Commission (NRC) defines decommissioning for a nuclear facility. The process safely shuts down the facility once it is no longer useful. It reduces leftover radioactivity so the property can be released for unrestricted or restricted use. The work may include taking the facility apart or converting the site to another purpose.
Decommissioning is not the same as a temporary closure, and it is not only dismantling. It ends the service life of the asset. Dismantling, cleanup, plugging, data removal and site release are steps inside it. Spanish desmantelamiento names the dismantling step.
Nuclear decommissioning
The NRC describes two main options.
- DECON. Soon after closure, the operator removes or decontaminates equipment and structures until the property can be released and the license ends.
- SAFSTOR. The operator keeps the facility under monitoring while radioactivity decays. Later it dismantles the facility and decontaminates the property.
An operator can dismantle some areas and keep others in SAFSTOR. The work must finish within 60 years of the end of operations, unless a longer period protects public health and safety.
The NRC steps are:
- The operator certifies permanent cessation of operations within 30 days of shutdown.
- It certifies that the fuel has left the reactor vessel for good. This ends its authority to operate.
- It submits a post-shutdown report within two years of the cessation certificate. The NRC publishes it and holds a public meeting near the plant.
- Major work may start 90 days after the NRC receives the report, if conditions are met.
- It submits a license termination plan within two years of the expected license end.
- After final surveys show the site is suitable for release, the NRC issues a letter that ends the license.
For unrestricted release, residual radiation must stay below 25 millirem of annual exposure. Before operations start, the operator must also set up a financial mechanism, such as a trust fund, to pay for decommissioning.
Offshore oil and gas decommissioning
BSEE says that decommissioning is part of the lease agreement. It covers plugging the well and disposing of the production equipment.
- The operator must permanently plug all wells within 1 year after the lease terminates (30 CFR 250.1710).
- The topside usually goes ashore for recycling or reuse. The substructure is typically cut 15 feet (4.6 m) below the mudline and removed.
- Retired platforms must be removed and taken ashore within one year after the lease terminates.
- With approval, an operator may leave part of a structure as an artificial reef instead.
IT equipment and applications
When IT equipment leaves service, its data must not leave with it. NIST guides media sanitization, which makes access to the data on the media infeasible for a given level of effort. NIST published Rev. 2 of SP 800-88 on 26 September 2025. It replaced Rev. 1 of 2014. The sources checked for this page set no general steps for retiring an application.
Decommissioning at an airfield
ICAO Annex 14, EASA and the FAA do not use the word decommissioning in the texts checked for this page. They say that a runway or taxiway is permanently closed. They set rules for what stays visible and what stays powered.
- Closed markings. The aerodrome operator must show closed markings on a runway or taxiway that is permanently closed. The FAA uses a yellow X. EASA guidance puts a marking at each end and at most 300 m apart on a runway. The FAA puts the X at 1,000-foot (305 m) intervals (EASA ADR.OPS.B.071, FAA AC 150/5340-1M).
- Temporary closure. EASA lets an operator omit closed markings for a short temporary closure when air traffic services give adequate warning. For a permanent closure it does not (ADR.OPS.B.071).
- Old markings. ICAO Annex 14 requires that all normal markings are obliterated. EASA requires that they are physically removed. The FAA requires this for threshold, designation, aiming point and touchdown zone markings only. It recommends but does not require the removal of the others (Annex 14 7.1.1.1, ADR.OPS.B.071, AC 150/5340-1M).
- Lights. Lighting on a closed runway or taxiway is not operated, except as needed for maintenance. The FAA also disconnects the lighting circuits (Annex 14 7.1.1.2, ADR.OPS.B.071, AC 150/5340-1M). A light that is permanently out of service is a decommissioned light .
- Night entrance. When a closed area meets a usable runway or taxiway that serves night traffic, EASA adds unserviceability lights across the entrance (ADR.OPS.B.071 (e)).
- Abandoned airport. If all runways close permanently, the FAA disconnects the airport beacon (AC 150/5340-1M).
- Cables. The FAA construction specification says to remove old and abandoned cables. They must not stay in the duct bank, conduit or handhole system (AC 150/5370-10H, Item L-110).
What this means for inspection
A permanently closed runway or taxiway should show closed markings and have lights that are not operated. TarmacView inspects the airfield lighting that stays in service against its own requirements. It does not plan or carry out decommissioning work.
Frequently Asked Questions
- What is decommissioning?
- Decommissioning is the process that takes a facility or system permanently out of service. The US Nuclear Regulatory Commission defines it for a nuclear plant as safe shutdown, then cleanup so the property can be released. Other fields use the same word for their own steps.
- What are the steps of the asset decommissioning process?
- The steps depend on the asset type, and no single standard sets them for all assets. The sources on this page show three patterns. A nuclear plant follows the NRC steps, an offshore well is plugged and its platform removed, and IT media is sanitized.
- Is decommissioning the same as dismantling?
- No. Dismantling is one possible part of decommissioning. The NRC says the work may include taking the facility apart or converting the site to another purpose. In Spanish, desmantelamiento names the dismantling part.
- How long does nuclear decommissioning take?
- It must finish within 60 years of the end of operations. A longer period is allowed only when needed to protect public health and safety. The NRC names two main options, DECON for early dismantling and SAFSTOR for deferred dismantling.
- What does decommissioning an offshore platform involve?
- The operator plugs the wells, removes the equipment and clears the site. The US Bureau of Safety and Environmental Enforcement (BSEE) says retired platforms must come ashore within one year after the lease ends. Reef conversion is an approved alternative.
- Is a permanently closed runway the same as a decommissioned runway?
- The airfield sources on this page do not use the word decommissioning. They use the term permanently closed. EASA requires closed markings, removal of the old markings, and no operation of the lights except for maintenance.
- What happens to the markings and lights of a permanently closed runway?
- ICAO Annex 14 requires that all normal markings are obliterated, and EASA requires that they are physically removed. The lights are not operated except for maintenance. The FAA also disconnects the lighting circuits.
References
- nrc-glossary-decommissioning
- Glossary: Decommissioning US Nuclear Regulatory Commission
- nrc-decommissioning-fact-sheet
- Backgrounder on Decommissioning Nuclear Power Plants US Nuclear Regulatory Commission
- bsee-decommissioning
- Decommissioning US Bureau of Safety and Environmental Enforcement
- cfr-30-250-1710
- 30 CFR 250.1710 US Electronic Code of Federal Regulations
- nist-sp-800-88r2
- NIST SP 800-88 Rev. 2, Guidelines for Media Sanitization NIST
- easa-ear-aerodromes
- Easy Access Rules for Aerodromes (Regulation (EU) No 139/2014) EASA
- icao-annex-14-vol-i-9ed
- Annex 14 to the Convention on International Civil Aviation, Volume I, 9th edition (July 2022) ICAO, copy hosted by the Swiss Federal Office of Civil Aviation
- faa-ac-150-5340-1m
- AC 150/5340-1M, Standards for Airport Markings (Change 1) FAA
- faa-ac-150-5370-10h
- AC 150/5370-10H, Standard Specifications for Construction of Airports FAA
This is a reference entry. TarmacView provides drone inspection services and doesn't sell the equipment or materials described in this glossary.