Direct answer
AC 150/5335-5D is the FAA circular on reporting airport pavement strength as a Pavement Classification Rating (PCR). It is voluntary in general and mandatory on projects funded through AIP grants or PFC revenue. It replaced the PCN edition and says paved runways with air carrier service at Part 139 airports need gross weight and PCR data by 28 November 2025.
Key takeaways
  1. 01 The circular is dated 29 April 2022 and cancels AC 150/5335-5C, the PCN edition. It is mandatory on AIP-funded and PFC-funded projects and voluntary elsewhere.
  2. 02 Paragraph 4 says the FAA requires paved runways with air carrier service at Part 139 airports to have gross weight and PCR data by 28 November 2025. The text of 14 CFR 139.339, which the circular cites, does not mention PCR.
  3. 03 A PCR is a five-part code such as 800/R/B/W/T. It is found either from the largest ACR among current traffic or by a technical evaluation, and the method must be reported.
  4. 04 The circular says there is no mathematical correlation between a PCN and a PCR. It gives no conversion, so a PCR has to be worked out again.
  5. 05 The circular never mentions drones or the Pavement Condition Index. A surface survey is not an input it names, and layer thickness and subgrade modulus decide a technical PCR.
On this page · 9 sections
For
Airport engineers and pavement managers at US airports who have to publish a PCR for each runway and want the circular's procedure at paragraph level.
Airport operators outside the US who need to see how the FAA applies the ICAO ACR-PCR method to what they publish in their own AIP.
Pavement survey teams who want to know where surface condition data meets a strength rating and where it does not.
Not for
Designing a new pavement or choosing an overlay thickness, which AC 150/5320-6 covers.
Rating the surface condition of a pavement, which ASTM D5340 and the Pavement Condition Index cover.

ACN-PCN is the older ICAO way to report pavement strength, an Aircraft Classification Number set against a Pavement Classification Number. AC 150/5335-5D replaced it with ACR-PCR and says the two have no mathematical correlation. It gives no method for finding a PCN. A PCR comes from the Using Aircraft method or a Technical Evaluation.

Every runway an airline plans a landing on has to answer one question before the performance numbers matter: will the pavement take this aircraft. The FAA answers it with a single circular. AC 150/5335-5D, dated 29 April 2022 and initiated by AAS-110, tells airports how to work out a Pavement Classification Rating and write it into the Airport Master Record. It replaced the 2014 edition, 5C, which used the PCN. It does not design or evaluate a pavement. It describes how to report the result.

What the circular is, and who it binds

Paragraph 1 says the circular gives guidance for reporting runway, taxiway and apron pavement strength in line with ICAO methods. Paragraph 3 sets its status. It does not constitute a regulation and is not legally binding in its own right. Conformity is voluntary, with two exceptions. Use is mandatory for projects funded under federal grant programmes including the Airport Improvement Program, through Grant Assurances 11 and 34. It is also mandatory for projects funded by the Passenger Facility Charge program, through PFC Assurance 9. A note adds that the circular is one, but not the only, acceptable means of meeting 14 CFR Part 139.

Paragraph 4 then splits by audience. The FAA recommends the ACR-PCR method for all paved runways, taxiways and aprons at all airports. It requires public use paved runways with air carrier service at Part 139 certificated airports to be assigned gross weight and PCR data by 28 November 2025, and cites 14 CFR 139.339 for it. Airports that have received AIP funds or been approved to collect PFC revenue are to update their Airport Master Record data on gross weight and PCR in step with their pavement management programme.

One point needs care. The text of 139.339 on eCFR, as of 20 October 2026, is the airport condition reporting section. It lists conditions to pass to air carriers, such as construction, surface irregularities and lighting faults, and does not mention PCR, pavement strength or gross weight. So the November 2025 date rests on what the circular states. The regulation itself, and any FAA certification guidance built on it, should be read directly for what an inspector will ask of a given airport.

THE CIRCULAR

AC 150/5335-5D at a glance

Issuer
Federal Aviation Administration, initiated by AAS-110. Dated 29 April 2022.
Replaces
AC 150/5335-5C, Standardized Method of Reporting Airport Pavement Strength - PCN, dated 14 August 2014.
Status
Voluntary in general. Mandatory for AIP-funded and PFC-funded projects through Grant Assurances 11 and 34 and PFC Assurance 9 (paragraph 3).
Scope
Public use airports with pavement bearing strength of 12,500 lb (5,700 kg) or more. Lighter pavements report only the gross weight and gear configuration the pavement can take (paragraph 1.3).
Subgrade categories
A 200 MPa, B 120 MPa, C 80 MPa, D 50 MPa, as elastic modulus (Table 2-1).
Tire pressure codes
W no limit, X 254 psi (1.75 MPa), Y 181 psi (1.25 MPa), Z 73 psi (0.50 MPa) (Table 4-2).
Methods
Using Aircraft (U) or Technical Evaluation (T). The method is part of the reported rating (paragraph 4.2).
Software
ICAO-ACR 1.3 inside FAARFIELD 2.0, both public domain (paragraph 3.2).
Overload guideline
ACR up to 10 percent above the PCR for occasional traffic, under about 5 percent of annual traffic (Appendix C).

From PCN to PCR, and the dates

The old system compared an Aircraft Classification Number with a Pavement Classification Number. The new one compares an Aircraft Classification Rating with a Pavement Classification Rating. Paragraph 1.2 says ICAO started a study group in 2009 and adopted ACR-PCR with Amendment 15 to Annex 14. The circular’s own list of principal changes names two. It updates the effective date paragraph and it incorporates the pavement strength reporting changes adopted in Amendment 15.

The ICAO side is dated in the Foreword of Annex 14, Volume I. Amendment 15 was adopted on 9 March 2020 and took effect on 20 July 2020. The table lists three applicability dates for the amendment as a whole, 5 November 2020, 3 November 2022 and 28 November 2024. It does not say which subject takes which date. The date for the reporting of pavement strength comes from EASA’s FAQ. It says ICAO set a four-year transition and that the method became applicable on 28 November 2024. The Annex 14 text read for this page no longer contains the terms ACN or PCN, and its section 2.6 describes ACR-PCR alone.

DateWhat happenedSource
14 August 2014AC 150/5335-5C, the PCN edition, issuedAC 150/5335-5D, paragraph 2
9 March 2020ICAO adopts Amendment 15, including the reporting of pavement strengthAnnex 14, Foreword
20 July 2020Amendment 15 takes effectAnnex 14, Foreword
29 April 2022FAA issues 5D and cancels 5CAC 150/5335-5D, first page
28 November 2024ACR-PCR becomes applicable under ICAOEASA FAQ n.140472
28 November 2025FAA date for gross weight and PCR data on air carrier runways at Part 139 airportsAC 150/5335-5D, paragraph 4

The FAA date falls a year after the ICAO one. The circular gives no reason for the gap. It sets the date and cites 139.339.

How the PCR is determined

Chapter 2 starts with the ACR. The aircraft manufacturer provides the official figure. It is two times the derived single wheel load, in hundreds of kilograms, at a standard tire pressure of 218 psi (1.5 MPa). It is calculated for four standard subgrade categories. Chapter 3 says the only mathematical model in the method is layered elastic analysis, that an ACR may be rounded to the nearest multiple of ten for reporting (paragraph 3.5.3.1), and that the FAA provides ICAO-ACR 1.3 and FAARFIELD 2.0, both public domain programs, to run it.

Paragraph 1.2.3 gives the rule that ties the two ratings together. A pavement with a given PCR can support an aircraft whose ACR is equal to or less than that PCR. Paragraph 4.1 adds that “unrestricted” does not mean “unlimited”. It means no weight restriction when the PCR is at least the ACR. It does not account for pavement life. The PCR should be re-evaluated if traffic changes significantly, which the circular describes as a new aircraft type or traffic above what the original analysis assumed.

The two methods differ in how much they need.

Using Aircraft (code U). Paragraph 4.3 takes the ACR of every aircraft currently permitted on the pavement and reports the largest as the PCR. It needs no detail on the structure. When the subgrade is unknown, category B is recommended. The circular warns that one rare, heavy aircraft can inflate the PCR and that a rational approach is needed, based on a design period minimum of 250 annual departures. It discourages the method on a long-term basis.

Technical Evaluation (code T). Paragraph 4.4 asks for the traffic mix and frequency, the thickness, material type and strength of each layer, and the elastic modulus of the subgrade. It says an evaluation may need a combination of on-site inspections, load-bearing tests and engineering judgment. The recommended procedure in paragraph 4.4.3 computes a cumulative damage factor for the forecast traffic and finds the critical aircraft and its maximum allowable gross weight. The ACR of that aircraft at that weight is a candidate PCR. Where the critical aircraft is not the one with the highest ACR in the mix, the steps repeat with the next aircraft and the PCR to report is the highest value found (step 13). The rating is valid for the usage period assumed. A new evaluation is needed after rehabilitation or when traffic changes from the initial forecast.

Paragraph 4.4.5 closes the point. The PCR should not be used for pavement design or as a substitute for evaluation. Paragraph 1.4 says the same of the whole system, which is a method airport operators can use to judge acceptable aircraft operations and nothing more.

The reporting code

Paragraph 4.5 sets a five-part code, ordered and separated by slashes. The numerical PCR is reported in whole numbers. Where strength varies along a pavement, the PCR for the weakest segment should normally be reported, though judgment may pick a more representative segment if the weakest one is not in the most used part of the runway.

The pavement type is R for rigid and F for flexible. For a composite pavement, the type should be the one that best reflects its structural behaviour, and the circular calls it good practice to add a note that the pavement is composite and what the wearing surface is. The subgrade category is A to D, with the elastic modulus values in the table above. The tire pressure code is W, X, Y or Z. The circular says rigid pavements can usually be rated W. It says well-placed asphalt of 4 to 5 inches (10.2 to 12.7 cm) can generally be rated X or W, while thinner pavement of poorer asphalt should not be rated above Y. The method code is T or U.

The circular’s example is 800/R/B/W/T. That reads as a PCR of 800 on a rigid pavement over a medium strength subgrade, with no tire pressure limit and a technical evaluation behind it. ICAO’s Annex 14 gives its own examples in the same format, PCR 760 / R / B / W / T and PCR 550 / F / A / Y / U.

Appendix D asks for the whole string. The Airport Master Record takes allowable gross weights for single, dual, dual tandem and multiple dual-tandem gear. Other gear types are reported with the PCR alone. Whatever the PCR, the circular treats these as the maximum allowable gross weights, in thousands of pounds. They are 120 for single wheel gear, 250 for dual, 550 for dual tandem and 1,220 for the multiple dual-tandem configurations. Appendix E lists weights for each PCR and subgrade category, and the circular says that when an aircraft’s ACR is known, the reported PCR is the better basis than those tables.

Overloads

Appendix C takes the ICAO simplified method for aircraft that exceed the PCR. Occasional traffic with an ACR not above 10 percent over the PCR should not adversely affect the pavement. A PCR of 600 can support limited traffic of aircraft with an ACR of 660. The annual number of overload movements should not exceed approximately 5 percent of total annual traffic, and the circular says there is no exact guidance on how to count that. Overloads should not normally be permitted on pavement that already shows structural distress, in thaw following frost penetration, or when water could weaken the pavement or its subgrade. When overloads run, the owner should regularly inspect the pavement condition and review the criteria. Excessive repetition can cut pavement life or bring forward a major rehabilitation.

How the EU and ICAO texts compare

The European framework is the reference for an EU aerodrome, and it lags the other two. Regulation (EU) No 139/2014 makes the aerodrome operator determine, document and maintain aerodrome data under ADR.OPS.A.005. AMC1 ADR.OPS.A.005(a) lists the strength of pavements among that data. The method itself appears in GM1 ADR.OPS.A.005, guidance written with “should”, and the March 2026 Easy Access Rules text still describes ACN-PCN. EASA’s FAQ says application of ACR-PCR in Member States has been deferred to a later date while the method is transposed into the EU framework. The FAQ page was last updated on 1 October 2024, so check the current EASA and national position before relying on it.

The FAA writes its circular to implement ICAO, so Annex 14 is the common source. In Annex 14, Volume I, section 2.6.2 says that the bearing strength of a pavement intended for aircraft of apron mass greater than 5,700 kg shall be made available using the ACR-PCR method, and lists the same five items. A “shall” in Annex 14 is a Standard. Section 2.6.3 says a reported PCR means an aircraft with an ACR equal to or below it may operate, subject to any tire pressure or mass limits. Its note allows different PCRs where strength varies significantly with the season. Section 2.6.8 covers aircraft of 5,700 kg or less, for which the pavement reports a maximum allowable mass and tire pressure. Section 2.6.7 is a Recommendation. It says criteria should be set to regulate use by an aircraft whose ACR is higher than the PCR, and points to Attachment A, section 19, for the simple overload method. The 10 percent figure sits there too.

The practical result is that an aerodrome’s published code depends on its State’s AIP and not on the FAA circular. The FAA circular matters to a European reader as a worked procedure, with the FAARFIELD route to a technical PCR, for a rating system that Annex 14 already prescribes. The EASA CS-ADR-DSN page and the ICAO Annex 14 page set out those frameworks for lighting and visual aids. For the code format and the older number, see the PCN glossary entry and the glossary entry on pavement strength .

Where a drone survey fits

A PCR is a statement about structure. Surface imagery measures a surface. The circular never mentions drones, imaging or the Pavement Condition Index, so nothing in it either approves or rules out a survey method.

What the circular does say points to a limited role. A technical evaluation needs layer thicknesses, layer moduli and the subgrade modulus. Those come from records, coring, ground-penetrating radar and deflection testing such as a falling weight deflectometer , not from a photograph. Paragraph 4.5.5 describes a Using Aircraft PCR as the highest ACR among aircraft currently using the facility “and not causing pavement distress”. Paragraph 4.4.2 notes that serviceability usually falls through roughness or localized distress such as rutting or cracking. Appendix C asks the owner to inspect the pavement condition regularly while overloads are allowed, and bars overloads on pavement showing structural distress. A record of surface distress, georeferenced and repeated over time, is evidence for those judgments. It is not the rating.

TarmacView’s pavement condition assessment rates surface distress to ASTM D5340 and gives a PCI for each sample unit. The service is in development and offered as early access. It does not compute a PCR, measure layer thickness or subgrade stiffness, or replace a technical evaluation. Where an airport keeps both, the distress record can sit beside the PCR in its pavement management system and show when the traffic behind a published rating needs a second look. The pavement strength post sets out the same boundary in more detail.

Frequently Asked Questions

Is AC 150/5335-5D mandatory?
Only in part. Paragraph 3 says the circular is not a regulation and conformity is voluntary. It is mandatory for projects funded under federal grant programmes including the Airport Improvement Program (Grant Assurances 11 and 34) and for projects funded by the Passenger Facility Charge program (PFC Assurance 9). The circular adds that it is one acceptable means of meeting 14 CFR Part 139, not the only one.
When did the FAA move from PCN to PCR?
AC 150/5335-5D is dated 29 April 2022 and cancels the PCN edition, 5C of 14 August 2014. Its paragraph 4 recommends the ACR-PCR method for all paved runways, taxiways and aprons at all airports, and says the FAA requires gross weight and PCR data for public use paved runways with air carrier service at Part 139 airports by 28 November 2025. The circular cites 14 CFR 139.339 for that date.
Can a PCN be converted into a PCR?
The circular gives no conversion. Paragraph 1.4 states that there is no mathematical correlation between the earlier ACN-PCN system and ACR-PCR. A PCR is worked out from the aircraft classification ratings of the traffic, or by a technical evaluation, using the procedures in chapters 3 and 4.
How is a PCR determined?
Paragraph 4.2 allows two methods and requires the method to be reported. With the Using Aircraft method, the largest ACR among aircraft currently permitted on the pavement becomes the PCR. The FAA discourages it as a long-term basis and suggests a design period minimum of 250 annual departures. The Technical Evaluation method needs the traffic mix, the thickness, material and strength of each layer and the subgrade modulus, and runs a damage computation.
What does a PCR code look like?
Paragraph 4.5 gives a five-part code separated by slashes. The parts are the numerical PCR, pavement type (R rigid or F flexible), subgrade category (A to D), allowable tire pressure (W, X, Y or Z) and method (T technical or U using aircraft). The circular's example is 800/R/B/W/T. Appendix D requires all five elements to be reported, as in 573/F/C/W/T.
May an aircraft with an ACR above the PCR still operate?
The circular's Appendix C allows limited overloads. An ACR not above 10 percent over the PCR should not adversely affect the pavement as occasional traffic. Overload traffic should stay under about 5 percent of annual movements. Overloads should not normally be allowed on pavement that already shows structural distress, in thaw after frost, or when water could weaken the pavement or its subgrade. The owner should inspect the pavement condition regularly.
Can a drone survey produce a PCR?
No. The circular names no drone or imaging method. A technical PCR rests on layer thicknesses, layer moduli, subgrade modulus and a traffic forecast, none of which a surface image supplies. A survey can record surface distress, which the circular treats as evidence of how the pavement is behaving. A Pavement Condition Index from such a survey is a different measure from a PCR and the circular gives no link between them.
What is ACN-PCN and how is a PCN determined?
ACN-PCN is the previous ICAO system for reporting pavement strength, which AC 150/5335-5D replaced with ACR-PCR. The circular cancels AC 150/5335-5C, the PCN edition of 14 August 2014, and paragraph 1.4 says there is no mathematical correlation between the two systems. It does not describe how a PCN was found. Under the current method a PCR is found by Using Aircraft or by Technical Evaluation (paragraph 4.2).

References

easa-ear-aerodromes
Easy Access Rules for Aerodromes (Regulation (EU) No 139/2014) European Union Aviation Safety Agency
easa-faq-140472
EASA FAQ n.140472, application of the ACR-PCR method European Union Aviation Safety Agency
14-cfr-139-339
14 CFR 139.339, Airport condition reporting Federal Aviation Administration
Keep reading

Go a level deeper

Pavement Strength
glossary

Pavement Strength

Pavement strength is the load-carrying capacity of an airport pavement. The ACR and PCR rating, the five-part code, rigid and flexible pavements, how to find a PCR, overloads, and what a drone survey cannot measure.

PCN (Pavement Classification Number)
glossary

PCN (Pavement Classification Number)

The pavement classification number (PCN) reports the bearing strength of a pavement for heavy aircraft. ACN and PCN, the five-part code, how to find it, overload limits and the change to PCR.

FAA AC 150/5380-7: Airport Pavement Management Program
standards

FAA AC 150/5380-7: Airport Pavement Management Program

What FAA AC 150/5380-7B asks of an airport pavement management program: the yearly detailed inspection, the PCI three-year option, records, software and scope.

Get Started

Drone pavement condition assessment is in development

TarmacView is developing crack detection on drone imagery of runways, taxiways and aprons, coded to ASTM D5340. It is not offered yet. Ask us about early access.